
Gardenia Bay
Yas Island, Abu Dhabi
Aldar Properties85.5From
AED 1.1M
Handover
Q4 2027
Yas Island, Abu Dhabi
Under construction and selling from the developer.
We have not yet checked this project's escrow account or permit with the Dubai Land Department. Verify both directly before transferring any funds.
No handover date has been announced for this project, so there is nothing to hold the developer to. Ask what completion date your SPA commits them to before you sign it.
Aldar Properties is Platinum tier, delivering 82% of tracked projects on time with an average slip of 2.1 months.
Compiled from verified data. Not editable by developers or agents.
Current target
Not disclosed
We have not found the handover date Aldar Properties promised at launch. Their launch announcements state unit counts and amenities but no completion date, so there is no original promise to measure the current target against — and we will not substitute a figure from a listing portal for one.
We have not taken a construction reading for this project yet. We publish progress only where we have verified the reading ourselves and can name its source, so none is shown rather than estimated from the developer's own material.
Aldar's leisure-led island — Ferrari World, Yas Marina Circuit, Yas Mall and Warner Bros. World, wrapped in waterfront residential that has become Abu Dhabi's strongest resale story.
Documents
The same 42 points on every project, whatever its type or stage. We hold 10 of them here. The rest say so rather than disappearing — a record with gaps you can see is worth more than one that hides them.
10%
Complete
A · Identity
Every point in Location is computed from this.
B · Verification
The broker's advertising permit, not the developer's project registration.
We hold the last four digits only. Check the full number on your SPA against the developer's filing.
C · Timeline
Held write-once: no ordinary edit can move it.
D · Size and units
E · Price and payment
Derived from the price and the smallest unit. In sqft, not m².
A time-linked plan keeps taking money from a stalled site.
F · Running costs
G · Location
Computed from the map pin. Distance is arithmetic; drive time needs a routing provider we do not yet have, and we will not publish one we cannot source.
H · What you actually get
The single most trust-building thing on a property page, and almost nobody writes it.
I · Media and documents
J · Computed
We do not hold the launch promise, so there is nothing to measure against.
We do not have the handover date promised at launch on record, so there is no original commitment to measure the current target against.
Needs a price and a fee schedule for this emirate. We do not apply Dubai's rate elsewhere.
20 of the points that carry the completeness score are still open on this project. Every one of them is research we owe you rather than a fact the developer is withholding, and the request button beside each says which ones people are asking for.
Answered from the verified data on this page, not from marketing material.
No handover date has been announced for The Canopies at Yas Point. Ask the developer in writing what completion date your SPA commits them to.
AQARCHECK has not yet checked the escrow filing for The Canopies at Yas Point, so we cannot confirm it either way. Verify it directly with the Dubai Land Department before transferring any funds.
Aldar Properties, rated Platinum tier by AQARCHECK with a score of 85.5 out of 100. Across the projects we track they deliver 82% on time, with an average slip of 2.1 months.
We have not checked this project's registration with the Dubai Land Department. That is not a finding against it — a project can be fully registered and simply not yet researched by us. Verify the permit and escrow account directly before transferring funds.
Always confirm the escrow account number on your SPA against the developer's RERA filing before transferring funds.
Other developments in Yas Island and from Aldar Properties.

Yas Island, Abu Dhabi
Aldar Properties85.5From
AED 1.1M
Handover
Q4 2027
Yas Island, Abu Dhabi
Aldar Properties85.5From
AED 1.3M
Handover
Q2 2024