Townhouse clusters in DAMAC Hills 2 running six quarters behind the launch target — the largest slip among the projects we currently track.
Escrow account verified with Mashreq, last checked 4 Aug 2026.
Handover has moved from Q2 2025 promised at launch to Q4 2026 — 18 months later.
DAMAC Properties is Gold tier, delivering 58% of tracked projects on time with an average slip of 7.9 months.
Compiled from verified data. Not editable by developers or agents.
Promised at launch
Q2 2025
Current target
Q4 2026
This launch promise was recorded before we began storing the source alongside it, so we cannot yet name the announcement it was read from. The date itself is held write-once and has not moved.
We publish construction checkpoints only where we have verified the reading and can name its source. This project has one current reading and no earlier verified history — so none is shown rather than estimated.
Per-type size bands and starting prices are not published for this project. We show the range that covers all unit types rather than dividing it up, because that division would be a guess.
The cheapest unit, with the costs that do not appear on a price list.
Estimated. Fees are the published schedule and can change; mortgage, agency and valuation costs are not included.
Handover condition
Unfurnished
Dubai's highest-volume mid-market community. The entry point for most first-time investors, with the widest spread of quality between developers of anywhere we track.
Water
Sports
Convenience
Documents
The same 42 points on every project, whatever its type or stage. We hold 27 of them here. The rest say so rather than disappearing — a record with gaps you can see is worth more than one that hides them.
70%
Complete
A · Identity
Every point in Location is computed from this.
B · Verification
The broker's advertising permit, not the developer's project registration.
We hold the last four digits only. Check the full number on your SPA against the developer's filing.
C · Timeline
Held write-once: no ordinary edit can move it.
D · Size and units
E · Price and payment
Derived from the price and the smallest unit. In sqft, not m².
A time-linked plan keeps taking money from a stalled site.
F · Running costs
G · Location
Computed from the map pin. Distance is arithmetic; drive time needs a routing provider we do not yet have, and we will not publish one we cannot source.
H · What you actually get
The single most trust-building thing on a property page, and almost nobody writes it.
I · Media and documents
J · Computed
Handover has moved back 18 months since launch.
Estimated. Fees are the published schedule and can change; mortgage, agency and valuation costs are not included.
10 of the points that carry the completeness score are still open on this project. Every one of them is research we owe you rather than a fact the developer is withholding, and the request button beside each says which ones people are asking for.
Answered from the verified data on this page, not from marketing material.
The current target is Q4 2026. That is 18 months later than the Q2 2025 promised at launch. AQARCHECK last verified construction at 68% on 4 Aug 2026.
DAMAC Hills 2 — Verona has a registered escrow account with Mashreq under permit RERA-P-21-1590, last checked by AQARCHECK on 4 Aug 2026. Always confirm the account number on your SPA against the developer's official filing before transferring funds.
A Post-Handover plan: 20% on booking, 40% during construction, 20% on handover, and 20% over 24 months after handover. A 4% Dubai Land Department transfer fee applies on top of the purchase price.
Prices start at AED 1,650,000, around AED 940 per sqft, last checked 4 Aug 2026.
DAMAC Properties, rated Gold tier by AQARCHECK with a score of 78.2 out of 100. Across the projects we track they deliver 58% on time, with an average slip of 7.9 months.
Based on the post-handover plan. Instalments are billed against construction milestones, not a monthly schedule.
20% down + AED 70,200 fees
40% billed against construction milestones
20% of the purchase price
20% over 24 months
Excludes 20% payable after handover
Indicative only. Milestone instalments fall due when construction stages complete, so their timing shifts with the build. Service charges, mortgage costs and agency fees are not included.
Always confirm the escrow account number on your SPA against the developer's RERA filing before transferring funds.
Other developments in Jumeirah Village Circle and from DAMAC Properties.
Jumeirah Village Circle, Dubai
Azizi Developments64.8From
AED 720K
Handover
Q2 2027