Palace Beach Residence
Emaar Beachfront, Dubai Harbour, Dubai
Emaar Properties91.5From
AED 2.4M
Handover
Q4 2026
Emaar Beachfront, Dubai Harbour, Dubai
Under construction and selling from the developer.
Two towers on the outer edge of Emaar Beachfront with 270-degree sea views and direct access to the private beach promenade.
We have not yet checked this project's escrow account or permit with the Dubai Land Department. Verify both directly before transferring any funds.
Handover target of Q4 2027 is unchanged from what was promised at launch.
Emaar Properties is Platinum tier, delivering 87% of tracked projects on time with an average slip of 1.4 months.
At AED 3,120/sqft, 13% above the Dubai Harbour average of AED 2,763/sqft across 3 tracked projects.
Compiled from verified data. Not editable by developers or agents.
Promised at launch
Q4 2027
Current target
Q4 2027
This launch promise was recorded before we began storing the source alongside it, so we cannot yet name the announcement it was read from. The date itself is held write-once and has not moved.
We have not taken a construction reading for this project yet. We publish progress only where we have verified the reading ourselves and can name its source, so none is shown rather than estimated from the developer's own material.
Per-type size bands and starting prices are not published for this project. We show the range that covers all unit types rather than dividing it up, because that division would be a guess.
The cheapest unit, with the costs that do not appear on a price list.
Estimated. Fees are the published schedule and can change; mortgage, agency and valuation costs are not included.
Handover condition
Unfurnished
A 20 million sqft waterfront district between Palm Jumeirah and Bluewaters, built around the region's largest marina and cruise terminal. Emaar Beachfront sits at its center.
Wellness
Water
Lifestyle
Convenience
Documents
The same 42 points on every project, whatever its type or stage. We hold 24 of them here. The rest say so rather than disappearing — a record with gaps you can see is worth more than one that hides them.
46%
Complete
A · Identity
Every point in Location is computed from this.
B · Verification
The broker's advertising permit, not the developer's project registration.
We hold the last four digits only. Check the full number on your SPA against the developer's filing.
C · Timeline
Held write-once: no ordinary edit can move it.
D · Size and units
E · Price and payment
Derived from the price and the smallest unit. In sqft, not m².
A time-linked plan keeps taking money from a stalled site.
F · Running costs
G · Location
Computed from the map pin. Distance is arithmetic; drive time needs a routing provider we do not yet have, and we will not publish one we cannot source.
H · What you actually get
The single most trust-building thing on a property page, and almost nobody writes it.
I · Media and documents
J · Computed
Handover has not moved since launch.
Estimated. Fees are the published schedule and can change; mortgage, agency and valuation costs are not included.
13 of the points that carry the completeness score are still open on this project. Every one of them is research we owe you rather than a fact the developer is withholding, and the request button beside each says which ones people are asking for.
Answered from the verified data on this page, not from marketing material.
The current target is Q4 2027. That is unchanged from what was promised at launch.
AQARCHECK has not yet checked the escrow filing for Seapoint Residences, so we cannot confirm it either way. Verify it directly with the Dubai Land Department before transferring any funds.
A 80/20 plan: 20% on booking, 60% during construction, 20% on handover. A 4% Dubai Land Department transfer fee applies on top of the purchase price.
Prices start at AED 3,100,000, around AED 3,120 per sqft, last checked 9 Aug 2026.
Emaar Properties, rated Platinum tier by AQARCHECK with a score of 91.5 out of 100. Across the projects we track they deliver 87% on time, with an average slip of 1.4 months.
Based on the 80/20 plan. Instalments are billed against construction milestones, not a monthly schedule.
20% down + AED 128,200 fees
60% billed against construction milestones
20% of the purchase price
Full purchase price plus fees
Indicative only. Milestone instalments fall due when construction stages complete, so their timing shifts with the build. Service charges, mortgage costs and agency fees are not included.
We have not checked this project's registration with the Dubai Land Department. That is not a finding against it — a project can be fully registered and simply not yet researched by us. Verify the permit and escrow account directly before transferring funds.
Always confirm the escrow account number on your SPA against the developer's RERA filing before transferring funds.
Other developments in Dubai Harbour and from Emaar Properties.
Emaar Beachfront, Dubai Harbour, Dubai
Emaar Properties91.5From
AED 2.4M
Handover
Q4 2026