
Sobha One
Ras Al Khor, MBR City, Dubai
Sobha Realty84.2From
AED 1.6M
Handover
Q4 2026
Sobha Hartland II, MBR City, Dubai
Under construction and selling from the developer.
A curved, lagoon-facing tower in Hartland II with the crescent geometry Sobha has repeated across the phase.

We have not yet checked this project's escrow account or permit with the Dubai Land Department. Verify both directly before transferring any funds.
Handover has moved from Q4 2027 promised at launch to Q2 2028 — 6 months later.
Sobha Realty is Gold tier, delivering 74% of tracked projects on time with an average slip of 3.1 months.
At AED 2,040/sqft, 6% above the Sobha Hartland average of AED 1,933/sqft across 3 tracked projects.
Compiled from verified data. Not editable by developers or agents.
Promised at launch
Q4 2027
Current target
Q2 2028
This launch promise was recorded before we began storing the source alongside it, so we cannot yet name the announcement it was read from. The date itself is held write-once and has not moved.
We have not taken a construction reading for this project yet. We publish progress only where we have verified the reading ourselves and can name its source, so none is shown rather than estimated from the developer's own material.
Per-type size bands and starting prices are not published for this project. We show the range that covers all unit types rather than dividing it up, because that division would be a guess.
The cheapest unit, with the costs that do not appear on a price list.
Estimated. Fees are the published schedule and can change; mortgage, agency and valuation costs are not included.
Handover condition
Unfurnished
An eight-million-sqft freehold community inside Mohammed Bin Rashid City, 30% of it green space. Sobha self-builds everything here, which shows in the finish quality.
Wellness
Water
Lifestyle
Convenience
Every image says what it is. A render is an artist's impression; a site photo is the building on the day it was taken.
RenderDeveloper render, Sobha Realty. Shows the Riverside Crescent cluster and the Sobha Hartland 2 lagoon rather than tower 330 alone — the developer publishes no render of the single tower. Source: sobharealty.com/properties-in-dubai/330-riverside-crescent
Documents
The same 42 points on every project, whatever its type or stage. We hold 24 of them here. The rest say so rather than disappearing — a record with gaps you can see is worth more than one that hides them.
46%
Complete
A · Identity
Every point in Location is computed from this.
B · Verification
The broker's advertising permit, not the developer's project registration.
We hold the last four digits only. Check the full number on your SPA against the developer's filing.
C · Timeline
Held write-once: no ordinary edit can move it.
D · Size and units
E · Price and payment
Derived from the price and the smallest unit. In sqft, not m².
A time-linked plan keeps taking money from a stalled site.
F · Running costs
G · Location
Computed from the map pin. Distance is arithmetic; drive time needs a routing provider we do not yet have, and we will not publish one we cannot source.
H · What you actually get
The single most trust-building thing on a property page, and almost nobody writes it.
I · Media and documents
J · Computed
Handover has moved back 6 months since launch.
Estimated. Fees are the published schedule and can change; mortgage, agency and valuation costs are not included.
13 of the points that carry the completeness score are still open on this project. Every one of them is research we owe you rather than a fact the developer is withholding, and the request button beside each says which ones people are asking for.
Answered from the verified data on this page, not from marketing material.
The current target is Q2 2028. That is 6 months later than the Q4 2027 promised at launch.
AQARCHECK has not yet checked the escrow filing for 330 Riverside Crescent, so we cannot confirm it either way. Verify it directly with the Dubai Land Department before transferring any funds.
A 1% Monthly plan: 20% on booking, 40% during construction, 20% on handover, and 20% over 20 months after handover. A 4% Dubai Land Department transfer fee applies on top of the purchase price.
Prices start at AED 1,550,000, around AED 2,040 per sqft, last checked 6 Aug 2026.
Sobha Realty, rated Gold tier by AQARCHECK with a score of 84.2 out of 100. Across the projects we track they deliver 74% on time, with an average slip of 3.1 months.
Based on the 1% monthly plan, across the 20 months remaining to handover.
20% down + AED 66,200 fees
40% across 20 monthly instalments
20% of the purchase price
20% over 20 months
Excludes 20% payable after handover
Indicative only. Monthly instalments assume the plan runs evenly to the current handover target; a moved target changes the schedule. Service charges, mortgage costs and agency fees are not included.
We have not checked this project's registration with the Dubai Land Department. That is not a finding against it — a project can be fully registered and simply not yet researched by us. Verify the permit and escrow account directly before transferring funds.
Always confirm the escrow account number on your SPA against the developer's RERA filing before transferring funds.
Other developments in Sobha Hartland and from Sobha Realty.

Ras Al Khor, MBR City, Dubai
Sobha Realty84.2From
AED 1.6M
Handover
Q4 2026
Sobha Hartland, MBR City, Dubai
Sobha Realty84.2From
AED 1.5M
Handover
Q4 2027